Build a trade quote that wins the job and protects the margin — materials and labor itemized, assumptions and exclusions stated, variations priced by rule, and the professional one-page layout customers trust. Use when a tradesperson says 'help me quote this job', 'I keep losing money on jobs', 'customer wants a price for X', or 'how do I quote a day rate vs fixed'. Produces a ready-to-send quote plus the internal costing sheet behind it.
Start a fresh conversation. Replace the highlighted placeholders.
Use trade-quote-builder to draft an internal costing sheet and ready-to-send customer quote for [job scope and site details], using [real labor rates, materials, and travel costs] and [known site unknowns], with specific exclusions, a written-before-start variation rule, assumption flags, and a fixed-versus-day-rate recommendation; include only stated certification or insurance claims.
Required inputs
[job scope and site details]
[real labor rates, materials, and travel costs]
[known site unknowns]
User-approved starter prompt based on a pinned source version; check current skill requirements before running. Task evidence ↗
SKILL.md
name: trade-quote-builderdescription: "Build a trade quote that wins the job and protects the margin — materials and labor itemized, assumptions and exclusions stated, variations priced by rule, and the professional one-page layout customers trust. Use when a tradesperson says 'help me quote this job', 'I keep losing money on jobs', 'customer wants a price for X', or 'how do I quote a day rate vs fixed'. Produces a ready-to-send quote plus the internal costing sheet behind it."
Trade Quote Builder Skill
Most trade quotes lose money in the writing, not the doing: labor guessed
optimistic, materials priced from memory, and — the killer — no exclusions
line, so "while you're here, could you also…" becomes free work. A
professional quote is two documents: the internal costing sheet (honest hours
× real rate + materials + margin) and the customer's one-pager (clear scope,
what's included, what isn't, how variations get priced). This skill builds
both, and it prices the variation rule in advance — because the profitable
jobs are the ones where "extra" was defined before it happened.
What This Skill Produces
The internal costing sheet: labor (tasks × honest hours × rate),
materials with waste factor, plant/access costs, margin — the math the
customer never sees but the price depends on
The customer quote, one page: scope in plain words, itemized or
fixed-price sections, inclusions, exclusions (the load-bearing
paragraph), variation rule, validity window, payment terms pointer
A fixed-vs-day-rate recommendation for this specific job with the
reasoning (unknowns push day-rate; defined scope earns fixed)
The assumption flags: what was priced sight-unseen and what a site
visit must confirm
Required Inputs
Ask for (if not already provided):
The job as the customer described it, plus what the tradesperson saw/knows
(photos described, site visit notes, access issues)
Their real numbers: hourly/day rate they need (not the one they say when
nervous), typical material suppliers, travel distance
The unknowns: what can't be known until opened up (walls, boards, wiring)
Local context: is this a price-sensitive job or a reputation job?
Framework
Cost the job backwards from the tasks. Break the work into visible
tasks, each with honest hours (add the forgotten ones: setup, protection,
cleanup, disposal runs, the merchant trip). Optimism in hours is the #1
margin leak — challenge any task estimated in round afternoons.
Materials at today's prices + waste. List materials with a waste
factor (10–15% typical for boards/tiles; note it, don't hide it) and
"prices held for X days" — supplier prices move; the validity window is
protection, not decoration.
Write the exclusions like they'll be tested. They will. Standard set:
anything not listed in scope · faults discovered once opened up (priced
as variation) · moving furniture/other trades' work · parking/permits.
Specific beats general: "excludes repairs to joists found rotten" wins
arguments "excludes unforeseen work" loses.
Price variations by rule, in the quote. "Additional work agreed in
writing at £X/hour + materials before it starts." This single line
converts scope creep from a fight into a form.
Layout for trust. Business name/contact · scope · price (itemized or
fixed with sections) · inclusions/exclusions · variation rule · validity
· payment terms (see [[stage-payment-shield]]) · insurance/certification
lines where the trade has them. Flag: certification claims must be real —
never draft one the user didn't state.
Output Format
## Internal costing (yours only)
| Task | Hours | Rate | Labor | ‖ Materials | Qty+waste | Cost |
Subtotals · margin % · price floor: [the number below which this job loses]
## The quote (send this)
[One page, structured as above, in plain confident language]
## Fixed vs day rate for THIS job
[Recommendation + why · which unknowns would flip it]
## Confirm before starting
[The sight-unseen assumptions a site visit must check]
Quality Checks
Every task's hours include setup/cleanup/disposal — the forgotten
hours are named individually
The exclusions section is specific to this job, not boilerplate alone
The variation rule appears with a real rate and "in writing before it
starts"
The price floor is computed and stated internally — the user knows the
number below which walking away wins
No certifications, insurance, or guarantee claims invented — only what
the user stated goes on the quote
Anti-Patterns
Do not price to win by shaving hours — the costing sheet is honest even
when the final price discounts; know what the discount costs
Do not bury exclusions in small print tone — they're customer-facing
clarity, not gotchas
Do not quote firm on sight-unseen unknowns; that's what assumption
flags and variations are for
Do not use legalistic language a homeowner distrusts — plain and firm
wins jobs
Related
[[stage-payment-shield]] for deposits and payment stages;
[[home-contractor-quote-decoder]] is the customer's side of this table —
write quotes that survive it; [[late-invoice-escalation]] for afterwards.