plan-review
Review an implementation plan for major gaps, then revise the plan until no major issue remains. Use when asked to stress-test or improve a plan.
Try your first task
A source-grounded starter task has not been verified for this skill yet.
SKILL.md
name: plan-reviewdescription: Review an implementation plan for major gaps, then revise the plan until no major issue remains. Use when asked to stress-test or improve a plan.Review and revise an implementation plan
Review the plan against its issue, project rules, and current code. Fix major gaps in the plan itself. Continue until another evidence-based review finds no major issue.
Workflow
- Find the plan and read it. Read the referenced issue or specification and applicable project instructions.
- Check claims about current code against the repository. Use the codebase graph tools first when available. Read source only to verify relevant details.
- Look for major gaps in scope, feasibility, data flow, security, compatibility, failure handling, acceptance checks, tests, and required gates. Treat a gap as major when it can block delivery, break existing behavior, expose or lose data, or make success hard to verify.
- Revise the plan to fix verified gaps. Use the existing design and code where possible. State any unresolved decision or assumption clearly.
- Review the revised plan again against the same sources. Repeat until no major issue remains, or until a decision needs user input.
- Check the final file for consistency and whitespace. Do not implement the plan or change external systems unless the user asks.
Rules
- Keep the user's goal and scope. Do not turn a review into a redesign or add optional features.
- Separate verified facts from proposed design choices. Do not present a proposal as current project behavior.
- Check whether proposed contracts fit real callers, schemas, transports, and data paths.
- Include concrete acceptance checks and focused tests for risky or changed behavior.
- Treat missing labels, assignments, approvals, or other project gates as planning constraints. Do not use them to stop plan review.
- Ask the user only when a material choice cannot be resolved from the plan, issue, project rules, or code. Continue other review work first.
- Finish with the plan path, the major gaps fixed, and any remaining unverified decisions or checks.